Blueprint Reading Class

Course schedule: July 18 – August 22, 2026. An entry-level practical, hands-on course designed for commercial subcontractors, estimators, and field staff who need to read plans accurately for bidding, estimating, and construction.

Read plans accurately for bidding, estimating and construction.

An entry-level practical, hands-on course designed for commercial subcontractors, estimators, and field staff who need to read plans accurately for bidding, estimating, and construction.

Who should attend

Entry-level and experienced subcontractors, estimators, and construction professionals seeking to improve plan reading, quantity takeoff, and scope understanding.

Disclaimer: Spanish classes are only available in Dallas/Fort Worth at this time. Please read the class schedules carefully before selecting and continuing.

Two people in safety vests reviewing a set of blueprints with a tape measure

Dallas/Fort Worth

Six Saturdays, July 18 – August 22.

Language
Spanish
Time
Saturdays, 8:00 am – 1:00 pm
Location
RHCA HQ & Training Center
2210 W. Illinois Ave, Dallas, Texas 75224
  1. Week 1

    Jul 18

    Saturday

  2. Week 2

    Jul 25

    Saturday

  3. Week 3

    Aug 1

    Saturday

  4. Week 4

    Aug 8

    Saturday

  5. Week 5

    Aug 15

    Saturday

  6. Week 6

    Aug 22

    Saturday

Itinerary: ten classes

Each class pairs objectives and content with hands-on exercises on real plan sets.

  1. 1Blueprint basics and how a set is organized

    Objectives

    • Understand what’s in a commercial plan set and how to navigate it fast.
    • Know who owns what: architect vs engineer vs specialty drawings.

    Content

    • Sheet index: G, C, A, S, M, P, E, FP, ID, LS.
    • Title blocks: project name, sheet number, revision dates, seals, keynotes, general notes, abbreviations, symbols legend.
    • Addenda, bulletins, ASIs, CCDs: what changes your price and scope.

    Exercises

    • “Find it fast” scavenger hunt in a sample plan set.
    • Identify the latest revision, addenda impacts, and which sheets apply to your trade.
  2. 2Scales, dimensions, and measuring correctly

    Objectives

    • Read scales and take off quantities without common mistakes.

    Content

    • Architectural vs engineering scale, typical commercial scales.
    • Dimension strings, baseline dimensions, datum points.
    • Tolerances and “do not scale” rules.
    • Digital measuring in PDFs: settings, calibration, pitfalls.

    Exercises

    • Measure rooms and assemblies at different scales.
    • Calibrate a PDF and confirm against stated dimensions.
  3. 3Plans, elevations, sections, and details

    Objectives

    • Understand how drawings “talk to each other” and where the real info lives.

    Content

    • Plan views vs reflected ceiling plans.
    • Elevations: exterior/interior, storefront/curtainwall basics.
    • Sections: building sections, wall sections.
    • Details: where constructability and trade interfaces show up; callouts, detail references, match lines, key plans.

    Exercises

    • Trace a wall type from plan to wall section to detail.
    • Identify missing info and write a clean RFI question.
  4. 4Specifications, codes, and what actually governs

    Objectives

    • Know order of precedence and how specs affect labor and material.

    Content

    • Project manual structure, Division 01, trade divisions (CSI).
    • Performance vs prescriptive requirements.
    • Submittals, mockups, quality requirements that cost money.
    • Fire ratings, STC, ADA basics, egress: what subs must watch.

    Exercises

    • Pull 10 scope drivers from specs that change price.
    • Spot 5 “hidden” requirements in Division 01 that affect schedule and manpower.
  5. 5Scope delineation, exclusions, and coordination boundaries

    Objectives

    • Write scopes that protect you and catch gaps before you buy risk.

    Content

    • Typical trade boundary issues: blocking, sleeves, firestopping, sealants, temp protection.
    • Allowances vs alternates vs unit prices.
    • Owner-furnished/contractor-installed (OFCI) traps.
    • Qualification language that’s fair and defensible.

    Exercises

    • Build a “scope checklist” for your trade.
    • Draft a one-page inclusions/exclusions and clarifications sheet for a bid.
  6. 6Structural and civil fundamentals for subs

    Objectives

    • Read enough S and C sheets to avoid bad assumptions.

    Content

    • Grids, column lines, elevations/benchmarks, control lines.
    • Footings, slabs, embeds, anchors, rebar basics: what you must coordinate.
    • Civil site plan basics: grades, utilities, storm, erosion control.

    Exercises

    • Identify slab elevations and required transitions.
    • Locate embeds/anchors that affect your install and quantify the impact.
  7. 7MEP/FP basics and trade impacts

    Objectives

    • Understand MEP/FP drawings enough to coordinate and price conflicts.

    Content

    • Single-line vs plan views, risers, schedules.
    • Equipment schedules: power, clearances, weights, housekeeping pads.
    • Ceiling coordination: duct, pipe, conduit, lights, diffusers, sprinkler heads.
    • Penetrations and sleeves: who provides, firestopping scope.

    Exercises

    • Find 10 coordination conflicts and assign “owner” trade responsibility.
    • Create a penetration log from one area of the plan.
  8. 8Door, window, finish, and specialty schedules

    Objectives

    • Use schedules correctly and avoid underpricing scope items.

    Content

    • Door schedules, hardware sets, frame types, ratings.
    • Window/storefront schedules, glazing types.
    • Finish plans and finish schedules: flooring transitions, wall base, corner guards.
    • Equipment and specialty schedules relevant to interiors.

    Exercises

    • Build a quick takeoff from a door schedule and verify against plan tags.
    • Spot rating and hardware scope issues that change cost.
  9. 9Takeoff workflows for estimating

    Objectives

    • Turn drawings into quantities, labor assumptions, and a bid number.

    Content

    • Takeoff structure: zones/levels/areas, waste factors, productivity assumptions, crew mix.
    • Assemblies vs unit takeoff: when each is better.
    • Plan review checklist before takeoff starts.

    Exercises

    • Complete a mini takeoff (one floor or one area) using a template.
    • Compare two estimators’ quantities and reconcile differences.
  10. 10Pricing, risk, bid submission, and handoff to operations

    Objectives

    • Submit clean bids and set the project team up to win after the award.

    Content

    • Bid leveling: what the GC asks for and how to respond.
    • Addenda tracking and last-minute changes.
    • Schedule impacts, long-lead items, escalation language.
    • Turnover package: what the PM and foreman need from estimating.

    Exercises

    • Build a bid recap: scope, clarifications, assumptions, alternates, exclusions.
    • Create a turnover checklist and a “risk register” for the job.